Wednesday, March 14, 2007

Mi casa es su casa




Sunday 11th March

We spent most of the day finishing off the kitchen, fixing on doors and handles, and fixing the extra large wall cupboard to the wall, but as an ordinary cupboard. The new wall cupboard was missing some bits (dowels and fixing screws), which had been used on the other cupboard, so that will have to wait until Monday.

I was hoping to plumb in the sink…..hot and cold water and waste pipes…..but I think this is beyond me, although I may try the waste pipes in Monday. Worked out how to fix the sink to the worktop…..wrong type of fixing plates provided, so another trip to the ferreteria Monday.

We then transferred all the kitchen stuff that was in the tall white cupboard and other stuff from surfaces into the cupboards, which allowed the white cupboard to be released and taken upstairs to the front room to become a wardrobe. We also transferred the larger white wardrobe into the front room, and J designed a wooden ottoman to fit between them. The pine drawer unit was transferred to the small bedroom, along with the small bed which folded under the existing bed in there.

These furniture movements allowed the front bedroom to be transformed, with all our clothes stored away, and room for everything else to be stored, once the unit is made.

1 Comments:

At 7:39 AM, Anonymous Anonymous said...

Wow a kitchen!! How long have you waited for that! The house looks wonderful - at long last all of that hard work is paying off. Congratulations to you both for your perseverance and patience!! Tracie

 

Post a Comment

<< Home