Friday, October 24, 2008

Kitchen tiling











Period ending Friday 24th October

The weather has been very variable over the last 10 days or so, with several days of rain, although no torrential showers to test the drains. Minor jobs around the house on such days included tiling in the kitchen (see pics).

An earlier job was cementing cracks around the water tank base to prevent a persistent leak in the upper hall, which appears to have been successful.

0 Comments:

Post a Comment

<< Home